Drone view of new tarred roads cutting through red earth at Victoria Ranch, Masvingo

Since 1996 we've turned raw land across Zimbabwe into serviced communities. The roads, water, sewer and drainage go in before the first brick is laid.Serviced land across Zimbabwe since 1996. Roads, water and sewer first.

1996Incorporated
4,500+Stands availableStands
160+People on our teamPeople
ISO ×39001 · 14001 · 45001Certified
What we do

One company, from raw land to finished street.Raw land to finished street.

Most developers hire contractors for the hard part. We own the engineering, the plant and the people, so the work stays on schedule and up to standard.We own the engineering, the plant and the people.

01Develop

Property development

We plan and fully service land for homes, businesses and agriculture, then sell stands that are ready to build on.Fully serviced stands, ready to build on.

See our developmentsDevelopments
02Engineer

Civil engineering

Roads and storm-water drainage, water and sewer reticulation, dams and canals, plus the bulk earthworks underneath them.Roads, drainage, water, sewer, dams and earthworks.

Our engineering servicesServices
03Equip

Plant & equipment hire

Dozers, graders, excavators, compactors, tippers and low-beds from our own fleet, ready for your project.Our own fleet, ready for your site.

View the fleetFleet
How a Leengate site comes togetherHow a site comes together

From raw land to a street with an address.Raw land to an address.

Stage 01 / 05
Numbered stand peg 1166 at Arlington East
Arlington East · stand peg 1166
Bulk earthworks at Dunottar, Chitungwiza
Dunottar · bulk earthworks
Crew building a multi-cell culvert at Dunottar
Dunottar · culvert
New asphalt roads at Victoria Ranch
Victoria Ranch · new asphalt
Completed homes at Penrose, Nyabira
Penrose · homes on serviced stands

Every stand pegged and numbered.Pegged and numbered.

Layouts are drawn, approved by the local authority and pegged on the ground, so every buyer knows exactly which piece of land is theirs.Approved layouts, pegged on the ground.

  • Layout approval
  • Pegging
  • Land-use budget

Our own fleet moves the ground.Our fleet moves the ground.

Dozers, graders and excavators open the road reserves and shape the land to carry water away from homes.Road reserves opened, land shaped to drain.

  • Dozers
  • Graders
  • Excavators

The pipes go in before the houses.Pipes before houses.

Storm-water drains, access culverts, and water and sewer reticulation are built and tested while the stands are still empty.Drains, culverts, water and sewer, all in first.

  • Storm-water
  • Culverts
  • Water
  • Sewer

Tar, not promises.

Roads are surfaced in asphalt with kerbs and drainage, laid by the same teams who build public roads for the Ministry of Transport.Asphalt and kerbs, by our public-roads teams.

  • Base & sub-base
  • Asphalt
  • Kerbing

People move in.

Serviced stands are handed over and title processed. At Penrose and Haydon Park, the photos now show homes, cars and solar roofs.Stands handed over. Homes go up.

  • Title deeds
  • Approvals
  • Community
By the numbers

Thirty years of ground covered.Thirty years of ground.

Behind the plan in the background is Penrose, Nyabira: 2,698 stands on 143 hectares, drawn by our team.The background is our Penrose plan: 2,698 stands.

Since1996

Incorporated in Harare as a wholly owned Zimbabwean company.Zimbabwean-owned, Harare.

Stands4,500+

Serviced stands available across our developments.Serviced and available.

Delivered18+

Projects completed, from townships to mine infrastructure.Projects completed.

People160+

Engineers, operators, surveyors and sales staff.On our team.

Civil works on record

Public roads, mine works and access routes.Roads, mines, access routes.

Beyond our own developments, we build for government ministries, mining houses and telecoms operators in Zimbabwe and Botswana.For ministries, mines and telecoms.

Full project registerFull register
No.ProjectScopeClientYear
Roads05
01Kirkman RoadRoad rehabilitationMoTIDOngoing
02Old Mazowe RoadRoad construction, 10 kmMoTIDOngoing
03Heany Road, HarareResurfacingMoTID2022
04Westgate Traffic CircleConstruction of slip laneMoTID2021
05Chiremba RoadRoad constructionMoLGPW2012
Hydraulic & mining structures05
06Karowe Mine, BotswanaMine developmentSMEI Projects2014
07Botswana AshSalt pondsRunicta Engineering2014
08Orapa Mine, Botswana90 MW power stationSMEI Projects2013
09Jwaneng Mine, BotswanaModular tailings treatmentSMEI Projects2012
10Morupule Colliery, BotswanaColliery expansionSMEI Projects2010
Base stations & access roads03
11Nyanyadzi, Dangamvura & MarongolaNyanyadzi & 2 moreAccess roadsEconet / ZTE / Reutech2011
12Buhera & OdziAccess roadsEconet / ZTE / Reutech2010
13Muzarabani & Mana PoolsAccess roadsEconet / ZTE / Reutech2009
The Leengate site team in red overalls and hard hats, with the Zimbabwean flag
Our people

The people in red.

More than 160 engineers, operators, surveyors and site crew, working under certified safety, quality and environmental systems.160+ people under certified safety systems.

About Leengate
Our story

The name Leengate means opening new doors for Zimbabweans. What began as one small project in 1996 is now one of the country's leading names in civil engineering and property development.Leengate means opening new doors. One small project in 1996 grew into a leading name in Zimbabwe.

Read our story Engraved illustration of the Harare skyline
Est. Harare 1996

Thirty years, wholly Zimbabwean-owned.Zimbabwean-owned.

  • ISO
    9001
    Quality9001:2015
  • ISO
    14001
    Environment14001
  • ISO
    45001
    Safety45001
Looking for a stand?

Build on ground that's ready.Ground that's ready.

Tell us your budget, preferred town and stand size. We'll match you with available stands and take you through the options.Tell us your town and budget. We'll match you.

Leengate salesChat on WhatsApp